Project included: Feasibility Studies, Design, approval, funding, procurement, outages, and union and contractor’s management. This project involved the design and construction of a replacement Bay Head Substation in a single structure in New Jersey, including GIS, switchgears, transformers and all other associated power cable, devices, and controls. There placement Bay Head substation was constructed on the site of the existing facility. A redundant electrical utility feeder line for the new substation will also be included, to further increase resiliency. The substation will be elevated above flood elevation, as now required by codes and standards, and will utilize components designed to better withstand contact with saltwater in those places where project elements cannot be raised. The new substation will have two GIS, Switchgears, liquid-filled transformers to power Bay Head Yard’s buildings and the wayside power system that allows diesel locomotive engines tobe shut down overnight, reducing noise and air pollution.
Project Life Cycle consultancy. Diligene provided the below services:
The responsibility included reviewing the contractors-prepared CPM Schedules (baseline schedule, schedule updates, and mitigation schedules)to enforce contract requirements and for accuracy and reasonableness of schedule duration, logic and critical path. DILIGENE was also responsible for performing time impact analysis to quantify the 6-month delay of this project, identifying potential delay issues, and exploring what-if scenarios to recommend mitigation actions. DILIGENE produced written report of project status and schedule review, including scheduling methods, logic defects, duration issues, and any non-compliance with contract requirements.
DILIGENE team is working with Arcadis providing Billing Support Services to assist in generating and tracking customer and third-party invoices based......
read moreDILIGENE team is working with Skanska to provide CPM Scheduling Services for LGA Transmission Systems Contract 20 project.
read moreIn a move that further indicates the Hudson Tunnel Project is coming on strong, the board of the Gateway Development Commission
read moreDILIGENE team is working with WSP and MTA Construction & Development (“MTA C&D”) providing services to perform Indefinite Quantity Risk Assessment Consultant Services at various MTA......
read moreDelta-Railroad A Joint Venture LLC. (“Delta”) entered a sub agreement with the Contractor, Maryland Transit Solutions (“MTS”), an unincorporated joint venture consisting of Dragados USA, Inc.
read moreThe challenge was a new company culture change to introduce project controls as a tool in assisting Contracts and procurement, construction, and management.
read moreThis project involved Feasibility Studies, Design, approval, funding, procurement, contractor’s management for Ammunition Supply Point Storage Facilities along with outside site-restorations and multimillion dollar driveways.
read morePart of the NJ Transportation multibillion dollar improvement program, NJ DOT executed many projects to improve pavement and driving conditions to support new jersey drivers.